Metso Outotec has signed a contract for the delivery of key minerals processing technology to a new high-capacity copper concentrator in Russia. The customer and the contract value are not disclosed. Deliveries with similar scope typically exceed EUR 100 million. The order is booked in Metso Outotec’s fourth quarter 2020 orders received. In June 2020, Metso Outotec received an EUR 23 million order for two primary crushing stations for the same concentrator plant.
The concentrator will have four production lines with a total processing capacity of at least 80 million tonnes of ore per annum. Metso Outotec will deliver the main process equipment for grinding, flotation and dewatering, including grinding mills, TankCell® flotation cells in different sizes between 30 and 630 cubic meters, pressure filters, on-line sampling and analyzing system, field instrumentation and Proscon® automation for the whole concentrator plant. Equipment deliveries will take place during 2022 and 2023.
“We are extremely pleased about this order. The new concentrator, based on Metso Outotec’s proven proprietary technology, will enable our customer to build and develop their operations in a sustainable way and get the best value from their assets,” says Stephan Kirsch, President, Minerals business area at Metso Outotec.